System Responsibility and Product Safety

At a glance

Not a compliance check, but active risk management. Risks are identified, analyzed, mitigated, verified and monitored from the first day of design to the end of the system’s life cycle.

“Compliance” means ticking off a given checklist. “System responsibility” means asking what can actually happen on site throughout the system’s life cycle — and eliminating risks proactively.

Safety is not left to the final stage; it is built into every stage, from calculations to testing. The EU Machinery Regulation 2023/1230, ISO 12100 and IEC 61508 likewise require risk management, not mere compliance.

Key standards applied

  • ISO 12100
  • ISO 13849-1
  • IEC 61508
  • IEC 61511
  • (EU) 2023/1230
  • 2006/42/EC
  • ATEX 2014/34/EU
  • IEC 60079
  • TS EN ISO 12100
System Responsibility and Product Safety — technical drawing

System responsibility — a 5-stage process

  1. 01

    Risk identification

    • HAZOP and FMEA studies
    • “What-if” analyses: operator error, environmental anomalies, cascading failures
    • Hazardous area classification (ATEX / IECEx)
  2. 02

    Risk analysis

    • Likelihood × severity risk matrix
    • LOPA, SIL (IEC 61508) and Performance Level (ISO 13849)
    • ALARP principle
  3. 03

    Risk reduction

    • Inherently safe design
    • Engineering controls: interlocks, SIS, fail-safe design
    • Administrative controls, PPE and emergency response
  4. 04

    Verification

    • Functional safety tests
    • Fault injection and SIF proof tests
    • Commissioning safety walkdown
  5. 05

    Life cycle monitoring

    • Periodic HAZOP / FMEA reviews
    • Learning from near misses
    • Management of change and aging analysis

Our approach to product safety

Classic “compliance” approachProduct safety approach
“The standard requires this”“What will the system do on site?”
Checklist sign-offLiving risk register
Safety documentation at the end of designSafety by design from day one
Annual auditContinuous life cycle monitoring
Reliance on the manufacturer’s declarationIndependent verification
Regulatory minimumALARP — as low as reasonably practicable

Get technical advice and a quote for your project

Share your site conditions and requirements, and our engineering team will work with you to define the right solution.

Request a Quote

Get in Touch